Day 192 – 197 Soffit and Fascia

17 Jan

Maya helps Josh to put on his boots.

 

The house is now well on its way to looking very pretty indeed! As the soffit and fascia go on, the outside lights are attached, and the scaffolding is dismantled, it really feels like the end of the road for the building work. Dad even cut the grass and planted daffodil bulbs for the spring!

Externally, the levels need to be raised, so we don’t always have a two foot height difference between the inside and the outside. How we do this is still a mystery to me, but with the help of rock, steps and in time some kind of patio or decking, we’ll figure it out.

Once we get the electricity connected, the house will be a hive of activity again, but at the moment there is a little bit of a lull, waiting for the screed to dry! The heating needs to be on for at least a week, at which time the screed man will do a moisture test, and will hopefully give us the all clear to start painting and tiling.

This slideshow requires JavaScript.

Advertisements
 
Leave a comment

Posted by on January 17, 2012 in External Finishes, Screed

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

 
%d bloggers like this: